Voltiq

Hardwareless plant digital twin

Simulation live · GW-01

Decision system demo

Sambhajinagar Solar

1 MW · Maharashtra · Simulated field telemetry

A localized DC-side loss requiring inspection

Live output

646 kW

Current AC production

Expected output

800 kW

-19.2% deviation

Irradiance

910 W/m²

Weather station

Revenue at risk

₹7,540

Estimated per day

Explainable plant health

49

STRING DROP CRITICAL — INV-03 / MPPT-2 / SC-2. String-level underperformance at INV-03 / MPPT-2 / SC-2.

Performance

81

good

Equipment

70

degraded

Communications

100

optimal

Data quality

100

optimal

Operations

88

good

Active incident · critical

STRING DROP CRITICAL — INV-03 / MPPT-2 / SC-2

93% confidence

String-level underperformance at INV-03 / MPPT-2 / SC-2.

Evidence

  • SC-2 current is 36% below peer strings on INV-03 MPPT-2 for three intervals.
  • 1 related occurrence are active.

Probable causes

  1. Loose or damaged DC connector
  2. Partial shading, module damage, or bypass-diode activation
  3. String fuse or wiring resistance

Recommended field action

Inspect string harness and combiner; compare IV curve on affected string.

Owner
om engineer
Timeframe
immediate

Verify recovery

After repair, compare string current with peer strings at the same irradiance for at least two polling intervals.

Safety: Isolate DC, follow lockout-tagout, and verify absence of voltage before opening connectors.

1Gateway telemetry
2Data validation
3Contextual baseline
4Diagnosis
5Verified action